PRODUCTS
AMMT-041 Wear-resistant polyurea flooring material is the third-generation polyurea elastomer formed through on-site spraying of such raw materials as quasi-prepolymer, amine-terminated polyether and amine chain extender. As the revolutionary leap of the traditional construction technique, that technique organically combines the new materials, equipment and technologies, which is one of the most advanced construction techniques.
★ 100% solid content, no VOC, no pollution, green and environmentally protective.
★ Abrasion resistance is 2 times of that of traditional sport field.
★ Seamless and the surface is smooth.
★ Excellent weather fastness and chemical resistance.
★ With fast reaction speed and high production efficiency, the equipment can be put into use soon.
★ Excellent physical performance and good adhesive force to various substrates.
AMMT-041 polyurea flooring material is specially designed for sport field, and widely used for advanced sport fields, such as basketball court, tennis court, badminton court, protection of runway surface, etc.
All the parameters above are the physical performance tested after 7-day curing under the conditions of 23±2℃ and 50%±5% relative humidity after the spraying by Graco H-XP3 host &Fusion AP spray gun under laboratory condition.
Drying time (25℃), the surface will be dry within 3 minutes, while it can reach the walk strength within 10 minutes.
Thickness: 2-10mm (depending on user requirements)
Painting interval: Minimum: no time limit; Maximum: not more than 3 hours.
The metal substrate should be sandblasted to level Sa2.5, and coated with the matching specialized anti-corrosive primer. Before the construction of each layer, the surface of substrate should be ensured to be clean without such impurities as oil stains and dusts.
After the concrete is completely dry (the newly made concrete shall be hydrated and then dried for 28 days), remove the loose impurities on the surface, spray 1 layer of matched concrete seal primer, and conduct spraying construction after the primer solidification.
The high-temperature and high-pressure impact mixing equipment specified by our company must be used during construction.
Material A: 220kg/barrel; Material R: 210kg/barrel.
The packaging can be changed in accordance with user requirement.
This product shall be stored in the shady and cool, ventilated and dry warehouse, and rain, sun and fire source shall be strictly prohibited, while it shall be far away from the heat source, and the storage temperature shall be 15-40℃.
Under the condition of not opening the original packaging, the storage period of the product is 6 months since the production date, and if it exceeds the storage period, conduct inspection for the items specified by the product standard, and the product can still be used if it meets the technical requirements.
The product doesn't contain organic solvent, so it can be transported as non-dangerous goods. The transportation shall be strictly prevented from rain and sun, and shall conform to the relevant regulations of the transport department.
When using the product, it is required to wear labor protection appliances like work clothes, goggles, gloves and gas mask.
· During the construction, the substrate temperature shall be at least 3℃ higher than the dew point.
· Fully stir component R until it is completely even before the construction.
· The unfinished coating material of component A shall be sealed after filling nitrogen.
· That system is 100% solid content, and the addition of any diluent is forbidden.
· Good ventilation shall be guaranteed during the construction in a confined space.