AMMT-073B Water Based Polyurethane For Floors

AMMT-073B waterborne polyurethane topcoat is a two-component water-based finish made of polyurethane emulsion, special pigments and fillers, additives and deionized water. It is a healthy and safe special coating. It has excellent anti graffiti performance, non yellowing, scratch resistance, stain resistance, easy cleaning, excellent decoration and protection performance.
Product Details

Product Description:


AMMT-073B waterborne polyurethane topcoat is a two-component water-based finish made of polyurethane emulsion, special pigments and fillers, additives and deionized water. It is a healthy and safe special coating. It has excellent anti graffiti performance, non yellowing, scratch resistance, stain resistance, easy cleaning, excellent decoration and protection performance.


Features:


☆Green environmental protection, very low VOC.

☆Excellent decorative performance, good appearance, anti graffiti.

☆Excellent wear resistance and stain resistance.

☆Excellent medium resistance.

☆Excellent weather resistance, UV resistance,light and color retention, no yellowing.

☆Water is used as the dispersing medium, so there is no danger of combustion and explosion.


Application:


Suitable for a variety of substrates. It has excellent sealing, protection and decoration performance for aluminum, galvanized steel, concrete, masonry and other substrate surfaces.

Main performance indexes:

Gloss: high gloss, semi gloss

Mix ratio: 7:1 (weight)

Specific gravity: about 1.2kg/L

 

Item

Index

Testing standard

colour

Adjustable

Visual measurement

Fineness / mu m

≤40

GB/T 1724-1979

Drying time (25 ℃)

Surface dry time / h

≤3

GB/T 1728-79

Hard drying time / h

≤24

Shock resistant /cm

≥50

GB/T 1732-1993

Flexibility /mm

≤1

GB/T 1731-1993

Pencil hardness

≥3H

GB/T 6739-2006

Wear resistance (750g, 500r) mg

≤60

GB/T 1768-2006

Resistant to MEK wipe

≥100

GB/T 23989-2009

Scrub resistance / time

≥1000

GB/T 9266-2009

Salt fog resistance (60 μm) / h

≥1000

GB/T 1771-2007


Construction Description:


◇ A / B ratio: This product is packed in two components. The ratio of component A and component B is A: B = 7:1 (weight ratio). Before use, it must be mixed and stirred evenly according to the proportion.

◇ Diluent: Deionized water, which shall be evenly stirred when diluted with water.

◇ Theoretical coating rate: 10m2 / kg.

◇ construction method: roller coating, brush coating or air spraying.

◇ construction tools: roller, spray gun, air pump, brush, etc.


Item

Air spraying

Roller / brush

Spray hole specification

2-3mm


Injection pressure (Mpa)

0.3-0.4


Dilution

0-10%

0-10%


Tool cleaning: tap water

◇ After finishing the topcoat, someone shall be responsible for inspection to ensure uniform coating, consistent color, no missing coating, no bottom exposure, no wrinkle, no pimple. In order to avoid missing coating, two coats can also be applied. The recoating time at 25 ℃ shall be at least 6 hours.

◇ whether local tap water can be used for dilution can be tested. The method is to add a small amount of water to the mixed AB component and mix it evenly. After 2 hours of static, observe whether the mixed paint is a uniform liquid without demulsification or precipitation. If there is no demulsification, it can be used; if there is demulsification, deionized water needs to be purchased.


Drying time:


Wet film thickness: 500 μ m, relative humidity, 50 ± 5%

Substrate temperature / ℃

10

25

35

Touch drying time / h

6

3

1

Walking allowed time / h

36

24

12

Painting interval /h

Minimum/h

24

6

4

Maximum/d

7

7

7

Note: drying time is related to temperature, humidity and film thickness.


Substrate treatment:


◇ the surface coated with primer shall be free of dust and oil stain. Use proper detergent and high-pressure fresh water to remove the surface dirt. Do not use hydrocarbon solvent for cleaning.

◇If construction on the old paint film, the old paint surface should be rough making treated.

◇ If the base material is steel, sandblasted to Sa2.5 or ST3, with surface roughness of 30-70 μm, and applied with matching primer.

◇ clean the oil and dirt with clean water and spraying after dried.


Construction conditions:


◇ The coating temperature is 5-35 ℃, the relative humidity is less than 80%, and the surface temperature of the substrate is more than 3 ℃ higher than the dew point.

◇ The drying state of the coating is directly related to the volatilization rate of water, and the construction quality is greatly affected by the temperature, humidity and air flow in the construction area. During and after the surface coating construction, dust and other sundries shall be prevented from flying. When the ambient temperature is low, hot air shall be added for forced drying to ensure the final performance of the coating.

◇ Outdoor painting is not allowed in rainy, snowy, foggy or strongly windy days.

◇ Good ventilation shall be ensured at the construction site, and fire source and heat source shall be isolated at the same time.


Package specification:


Component A: 17.5kg/barrel component B: 2.5kg/barrel 


Storage:


The product shall be stored in a cool, dry and ventilated indoor warehouse, with a storage temperature of 5 ℃ - 30 ℃, away from heat and fire sources, and the packaging containers shall be sealed. The shelf life is 12 months from the production date.


Safety:


It is strictly prohibited to have any fire source at the batching and construction site, and keep good ventilation. Construction personnel must wear protective equipment to avoid skin contact. If the paint splashes on the skin, it shall be cleaned immediately with a suitable detergent or soapy water. If it splashes into the eyes, it shall be cleaned repeatedly with clear water immediately to keep the eyes open and seek medical treatment immediately.

Message
Submit